Interactive Classroom Technology Upgrade
GateTek modernized two classroom technology environments with new Samsung WA75F interactive displays, dedicated wired connectivity and supporting network infrastructure improvements.

Modernize the Classroom Without Overlooking the Infrastructure Behind It.
Page Academy's existing classrooms relied on aging projector-based SmartBoard systems that had been in service for many years. The school wanted a more modern and dependable interactive experience, while the new displays also needed stable network connectivity. The main-office technology area required better organization and cable management as part of the same project.

Aging Classroom Technology Ready for a New Approach.
The original projector-based systems occupied more wall space, depended on older components and no longer reflected the kind of simple, integrated classroom experience the school wanted.
GateTek approached the work as more than a display replacement—planning the mounting, connectivity and supporting infrastructure together.
Careful Installation. Coordinated Cabling.
GateTek technicians mounted equipment, ran dedicated network connections and prepared the classroom systems for configuration and testing.

Displays, Connectivity and Infrastructure Planned Together.
Interactive Displays
Removed the older projector-based systems and installed two Samsung WA75F 75-inch interactive displays.
Dedicated Ethernet
Installed two new Ethernet runs to provide each display with a stable wired network connection.
Network Cleanup
Reorganized network equipment and cabling in the school's main office for a cleaner, more serviceable setup.
Configuration & Handoff
Configured, tested and prepared the new classroom technology for day-to-day use by school staff.
A Cleaner, More Capable Classroom Technology Environment.
Page Academy now has two modern interactive classroom displays supported by dedicated wired connectivity and a more organized network foundation. The finished environment is easier to use, easier to support and better positioned for future technology needs.

Start With the Environment, Not Just the Equipment.
Interactive displays, network infrastructure, structured cabling and installation work better when they are planned as one project.